Period

Schema

startDate:

Date

OpenContracting Description: The start date for the period.

endDate:

Date

OpenContracting Description: The end date for the period.

startDate should always precede endDate.

Date

Date/time in ISO 8601.

Value

Schema

amount:

float, required

OpenContracting Description: Amount as a number.

Should be positive.

currency:

string, required

OpenContracting Description: The currency in 3-letter ISO 4217 format.

valueAddedTaxIncluded:
 

bool, optional

The default value is true.

Guarantee

Schema

amount:

float, required

OpenContracting Description: Amount as a number.

Should be positive.

currency:

string, required

OpenContracting Description: The currency in 3-letter ISO 4217 format. UAH by default.